Over the weekend, BOLT Lifesaver passed 50 days of non-stop power production since installation, i.e. 100% uptime. The 1 tone on-board client sensor package has been able to draw it’s nominal power during 76% of the time, allowing the client...
BOLT Lifesaver has now been installed for 25 days and is getting close to complete the initial four week commissioning phase. Power production has been maintained continuously since installation at reduced power settings to verify functionality of all systems. Apart...
On Friday Oct. 12th, divers from Sea Engineering Inc. successfully connected all three winch lines to seabed, to allow BOLT Lifesaver to initiate power production. Despite significant wave heights down to below 3 feet, power production was maintained uninterrupted through...
BOLT Lifesaver was towed from Pearl Harbor and connected to storm moorings at the 30m birth at the US Navy demonstration site outside Marine Corps Base, Hawaii. Divers are scheduled to connect the power take-off winch lines to seabed on...